Project Details:
Milton, VT
Project Overview:
Construction of 17,000 sf new production and manufacturing area for a specialized precast concrete production facility.
Structural steel frame coupled with energy-efficient insulated metal panel siding and tall building volumes maximize this facility’s efficiency and production capabilities. Work included the installation of cement storage silos, an external boiler for concrete batch mixing and radiant heating, four (4) overhead cranes, and the internalized batch plant.
Site work included integrating the facility into the existing production campus, installation of additional aggregate bins, and the creation of distribution areas for shipping completed structures.